Installed at the bottom of the casing string or tail pipe and serves to protect the casing from damage during descent

The design includes a check valve that duplicates the function of the Casing Centralizer Valve (CCV)

The reamer shoes feature a Super Germet ("SG") float-type check valve that provides effective sealing under low back pressure and resists deformation and damage to the elastomeric material under high back pressure

The valve design contains no steel elements, allowing it to be drilled out with PDC bits

The reamer shoes are equipped with a concentric plastic nose with a concrete filling that facilitates passage over ledges and grooves

The composite nose can be easily and quickly drilled out by PDC bits without damaging the bit's cutting elements and equipment.

Complies with API RP 10F Category IIIC standards for fatigue strength, pressure, and temperature applicable to check valve equipment used in casing cementing

Triangle Details
Triangle Collapse
REAMING SHOE

It is installed at the bottom of the casing string or liner and serves to protect the casing from damage during lowering.

Подробнее
Image
QUALITY STANDARDS
The product is certified for compliance with the technical regulations on "Safety of Machinery and Equipment" and has a Permit for Use issued by the Federal Service for Environmental, Technological, and Nuclear Supervision. The equipment is manufactured in accordance with the quality standard GOST R 53366-2009.
EFFICIENCY IN ANY CONDITIONS

The use of our shoes ensures precise direction of the casing string and prevents the risk of its sticking or damage in any wells under the most challenging working conditions.

WARRANTY OBLIGATIONS

The manufacturer guarantees the conformity of the casing reamer shoes to the requirements of TU 3665-019-78267833-2010, provided that the established rules and conditions of operation, storage, and transportation are observed.

The reliability of the Casing reamer shoe design ensures the safety of the casing descent

High efficiency in passing ledges and grooves

Easily and quickly drilled with PDC bits

Effective wellbore processing

Details
Collapse
CATALOGS

AVRORA

Download Catalog
EQUIPMENT IN STOCK

Check availability and select the optimal equipment. We will help you choose the best option for your needs.

Check Availability
Svetlana Vladimirovna Gordeeva

Sales Support Department

TRUSTED BY MANY

Over 20 leading companies in the oil and gas extraction market trust us.

Well Equipment
OIL

Oil well equipment that ensures high efficiency in extraction and safety.

GAS

Innovative management and control systems guarantee reliability and maximum performance.

GAS LIFT

A synthesis of advanced engineering solutions and reliability that contribute to increased extraction efficiency and cost reduction.