Used for displacing the cement slurry and obtaining a pressure spike — the "Stop" signal — indicating the end of the cementing process, when seated on the valve and engaging the locking mechanism, when no bottom plug is used. The plug is equipped with a polymer rotation-locking mechanism to prevent spinning during drilling
Features a rotation-locking mechanism to prevent spinning during drilling
Easily drillable with PDC bits
4-blade plug design
Maximum operating temperature at the bottom when using the plug is 120°C
Details
Collapse
4-Blade Cementing Top Plug
AVRORA 415
4-Blade Cementing Bottom Plug
AVRORA 416
Cementing Top Plug with Anti-Rotation
AVRORA 450 PLUG UP4
Cementing Bottom Plug with Anti-Rotation
AVRORA 451 PLUG DOWN 4
Cementing Bottom Plug with Polymer Lock
AVRORA 141-П Plug Down
Seal Stinger
AVRORA 710
Hydraulic anchor
AVRORA 716
Normalization Sleeve
AVRORA 661
Switching tool for gas regulator point couplings
AVRORA 705
Check availability and select the optimal equipment. We will help you choose the best option for your needs.
Check Availability
Svetlana Vladimirovna Gordeeva
Sales Support Department
Over 20 leading companies in the oil and gas extraction market trust us.
Oil well equipment that ensures high efficiency in extraction and safety.
Innovative management and control systems guarantee reliability and maximum performance.
A synthesis of advanced engineering solutions and reliability that contribute to increased extraction efficiency and cost reduction.