Used to ensure hydraulic connection between the tail pipe and the productive formation during multi-stage fracturing
Full-bore multi-stage fracturing valves activated by ball drop
Balls and seat dissolving or drilling options available
Equipped with a seat locking mechanism to prevent rotation during drilling
Pressure drop tolerance up to 68.9 MPa
Operating temperature up to 120°C
100% opening of technological ports during testing at maximum pressure with formation temperature
Hydraulic Multi-Stage Fracturing Valve
AVRORA 700“SHOT” Multi-Stage Fracturing Valve
AVRORA 703Multi-Stage Fracturing Valve with Frangible Ports
AVRORA 704Mechanically Activated Valve for Multi-Stage Fracturing
AVRORA 702Ball Shut-Off Valve for Multi-Stage Fracturing
AVRORA 708Hydraulic Shut-Off Valve for Multi-Stage Fracturing
AVRORA 707Hydraulic Frac Plug for Multi-Stage Fracturing
AVRORA 700Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 701М/2“SHOT” Frac Plug for Multi-Stage Fracturing
AVRORA 703Hydraulic Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 707Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 708It consists of a body with a sealing element equipped with end protections and a hydraulic pusher, which is secured by shear screws. To prevent reverse movement of the hydraulic pusher, a step retainer is installed. All parts of the packer are sealed with rubber O-rings.
No image found for this ID.
No matching content found.
AVRORA
Check availability and select the optimal equipment. We will help you choose the best option for your needs.
Check AvailabilitySales Support Department
Over 20 leading companies in the oil and gas extraction market trust us.
Oil well equipment that ensures high efficiency in extraction and safety.
Innovative management and control systems guarantee reliability and maximum performance.
A synthesis of advanced engineering solutions and reliability that contribute to increased extraction efficiency and cost reduction.