Used to ensure hydraulic connection between the tail pipe and the productive formation during multi-stage fracturing
Applicable in vertical, deviated, and horizontal completion well
Allows for reopening/closing of technological ports with a switching tool
Features a reusable locking mechanism after opening/closing the technological ports.
100% opening of the technological ports
Includes indication for the opening/closing of the valve
Prevents spontaneous opening/closing of the valve during subsequent multi-stage fracturing.
Details
Collapse
Hydraulic Multi-Stage Fracturing Valve
AVRORA 700
Ball Valve for Multi-Stage Fracturing
AVRORA 701М/2
“SHOT” Multi-Stage Fracturing Valve
AVRORA 703
Multi-Stage Fracturing Valve with Frangible Ports
AVRORA 704
Ball Shut-Off Valve for Multi-Stage Fracturing
AVRORA 708
Hydraulic Shut-Off Valve for Multi-Stage Fracturing
AVRORA 707
Hydraulic Frac Plug for Multi-Stage Fracturing
AVRORA 700
Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 701М/2
“SHOT” Frac Plug for Multi-Stage Fracturing
AVRORA 703
Hydraulic Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 707
Ball Valve Frac Plug for Multi-Stage Fracturing
AVRORA 708
It consists of a body with a sealing element equipped with end protections and a hydraulic pusher, which is secured by shear screws. To prevent reverse movement of the hydraulic pusher, a step retainer is installed. All parts of the packer are sealed with rubber O-rings.
Check availability and select the optimal equipment. We will help you choose the best option for your needs.
Check Availability
Svetlana Vladimirovna Gordeeva
Sales Support Department
Over 20 leading companies in the oil and gas extraction market trust us.
Oil well equipment that ensures high efficiency in extraction and safety.
Innovative management and control systems guarantee reliability and maximum performance.
A synthesis of advanced engineering solutions and reliability that contribute to increased extraction efficiency and cost reduction.